The European Commission has published Implementing Regulation (EU) 2026/977, adopted on 4 May 2026 and published in the Official Journal on 5 May. It lays down uniform quality management and procedural requirements for the conformity assessment work carried out by notified bodies designated under the Medical Device Regulation and the In Vitro Diagnostic Regulation.
In its accompanying announcement, the Commission frames the regulation as part of the wider effort to streamline and simplify the device rules, aiming to support the availability of devices on the EU market and the sector’s competitiveness while upholding patient safety. The driver is a familiar industry pain point: notified bodies have applied divergent practices on quotations, timelines and re-certification, producing wide variation in cost and turnaround for similar work, with the heaviest impact on small and medium-sized manufacturers.
The regulation addresses this in four main ways:
- Quotations. Notified bodies must give manufacturers a reliable up-front estimate of the services and costs involved, and flag any cost increase above 10 per cent in advance.
- Maximum timelines and clock-stops. Binding ceilings apply to the key stages, including application review and contract signature, quality management system audits, product verification, and the decision and certificate issuance. The number of times a notified body can pause the clock for manufacturer input is capped.
- Monitoring and transparency. Notified bodies must set up a system to track the duration and cost of their conformity assessment activities and publish that data annually.
- Re-certification. Procedures and timelines for renewals are clarified, reducing uncertainty for both notified bodies and manufacturers.
The regulation applies from 25 February 2027, with the exception of the annual public report on timelines and costs, which applies from 1 January 2028. Files contracted before the application date run under existing practice, so the new framework mainly shapes engagements signed in 2027 onwards.
For manufacturers, the practical task is to map your certificate calendar against those dates so you know which engagements fall under the new framework, and to get your re-certification readiness in order while the timelines are still generous.
We have written up the full mechanics, including the exact timelines, the interruption caps, the quotation requirements and the reframed re-certification scope, in a detailed Spotlight article. Read the full breakdown here.