The deadline for manufacturers of legacy Class C IVDs to sign a written agreement with a notified body fell on 26 September 2026. It was set by Regulation (EU) 2024/1860, which amended Article 110 of the IVDR and was published in the Official Journal on 9 July 2024. In May we covered the 26 May 2026 application deadline for the same devices. This was the second and final gate.
TLDR: If you lodged your application by 26 May 2026 and signed a written agreement by 26 September 2026, and you meet the other conditions, your Class C legacy devices can continue to be placed on the market until 31 December 2028. If you missed either step, the transitional period no longer covers new units of those devices.
The conditions, in full
Article 110(3b) covers devices that did not need a notified body under the IVD Directive, had a declaration of conformity drawn up before 26 May 2022, and now require a notified body under the IVDR. For Class C devices the end date is 31 December 2028.
Article 110(3c) sets the conditions that must all be met:
- the devices continue to comply with Directive 98/79/EC;
- there are no significant changes in design and intended purpose;the devices do not present an unacceptable risk to health or safety;by 26 May 2025, the manufacturer had put in place a quality management system in accordance with Article 10(8) IVDR;by 26 May 2026, the manufacturer or authorised representative had lodged a formal application with a notified body under Annex VII, Section 4.3, first subparagraph, for the legacy device or a device intended to substitute it;
- by 26 September 2026, the notified body and the manufacturer had signed a written agreement under Annex VII, Section 4.3, second subparagraph.
These conditions continue to apply after the deadlines. The Commission’s Q&A on the extended IVDR transitional periods states that if, after the deadlines, the manufacturer withdraws its application or the written agreement is terminated, the conditions “are not met any longer; therefore the transitional period ceases to apply.” The Q&A also confirms that moving to another notified body remains possible, provided the manufacturer signs a written agreement with the new notified body at the same time and the application is transferred to it.
If you signed in time
Treat the written agreement as the start of the work. It should set out the timeline for submitting your technical documentation and for the conformity assessment, and you need to keep to it. Your IVDR certificate has to be in place before 31 December 2028 for the device to stay on the market after that date.
The IVDR requirements on post-market surveillance, market surveillance, vigilance and registration of economic operators and devices already apply to these legacy devices under Article 110(3d). A notified body reviewing your file will expect those systems to be working, so gaps here will slow the assessment.
If you missed the deadline
From 27 September 2026, a Class C legacy device without a signed written agreement can no longer be placed on the EU market under the transitional provisions. Each unit counts separately, so this applies to new units you would release from that date onwards.
Units already placed on the market before the deadline are treated differently. Regulation (EU) 2023/607 removed the IVDR “sell-off” date, and the Commission has explained that such devices may continue to be made available “without any limitation in time without prejudice to the device’s possible shelf-life or expiry date.” Distributors can continue to sell existing stock.
From there, we would work through four steps.
- Stop new releases and confirm your stock position. Identify exactly which devices and which units were placed on the market before 27 September 2026, and make sure your release process blocks new units.
- Check your Article 10a obligations. Since 10 January 2025, a manufacturer that anticipates an interruption or discontinuation of supply must inform the competent authority, and the economic operators, health institutions and healthcare professionals it supplies directly, where it is reasonably foreseeable that this could result in serious harm or a risk of serious harm to patients or public health. The information is due at least six months in advance except in exceptional circumstances, so if you have not yet assessed this, do it now.
- Continue towards IVDR certification. Missing the transitional deadline does not end your route to market. If your application is in progress, complete the conformity assessment and place the device on the market once the IVDR certificate is issued.
- Treat a national derogation as a last resort. Article 54 IVDR allows a competent authority to authorise a specific device without a completed conformity assessment where this is in the interest of public health or patient safety or health. This is decided case by case and should not be relied on as a plan.
Class B and Class A sterile: the next deadlines
The same two-step structure applies to Class B devices and Class A devices placed on the market in sterile condition, twelve months later:
- formal application lodged with a notified body by 26 May 2027;
- written agreement signed by 26 September 2027;
- transitional period ending 31 December 2029.
The quality management system condition for these devices already applied from 26 May 2025. Our advice is to anchor 26 May 2027 as the working deadline for a sufficiently complete application, and to choose your notified body well before that. Class C manufacturers who applied close to May 2026 will recognise how much time can be lost to capacity questions and document requests. Plan to have the written agreement signed well ahead of September 2027 rather than relying on the four-month window between the two dates. If you are working through a missed deadline, or planning the Class B and Class A sterile transition across a portfolio, get in touch. This is the kind of deadline-driven work our regulatory consulting team supports every day.