The Medicines and Healthcare products Regulatory Agency (MHRA) has published new pre-market regulatory requirements for medical devices and in vitro diagnostic devices (IVDs) entering the Great Britain market. The draft, titled the Medical Devices (Amendment) Regulations 2026, was notified to the World Trade Organisation TBT portal on Friday 8 May 2026 under reference G/TBT/N/GBR/120, opening a window for WTO members to comment.
Alongside the WTO notification, the MHRA has opened a stakeholder impact survey inviting industry, approved bodies, healthcare providers and patients to comment on the practical effect of the changes. Responses will feed into the Impact Assessment and shape how the regulations are implemented.
The survey closes at 11:59pm UK time on Friday 19 June 2026.
What the Draft Regulations Cover
The pre-market draft is the long-awaited counterpart to the post-market surveillance rules already in force. It sets out to:
- Introduce a framework enabling swifter access for devices already approved by regulators in Australia, Canada and the USA, a form of international reliance.
- Make Unique Device Identifiers (UDI) compulsory to support precise identification and traceability across a device’s lifecycle.
- Align the classification of IVDs with International Medical Device Regulators Forum (IMDRF) standards.
- Align the essential requirements for devices in Great Britain with best international practice.
- Strengthen technical documentation retention requirements.
- Introduce new requirements for custom-made devices, improving traceability and enabling electronic prescriptions.
- Require manufacturers to align the claims they make about a device with its stated intended purpose.
- Require healthcare organisations that implant devices to give patients implant cards carrying information about the device.
- Pre-determined Change Control Plan (PCCP).
- Updates for e-IFU and implant cards.
The MHRA frames these proposals as patient-centred and proportionate, and ties them to the Government’s Life Sciences Sector Plan ambition for the UK to become one of the three fastest countries in Europe to access MedTech by 2030.
One Interesting Outlier
Quite controversially, a review of the rules in Schedule 9 reveals that there is no new rule added specifically to classify medical device software. With the EU moving to try to align itself with the IMDRF software classification system, in this case, the MHRA seem to be content with the system under the existing UK MDR 2002. This is either a serious mistake on their end and a missed opportunity, or done intentionally. Either way, this is still a draft and we may expect this to change over the course of the legislative process.
What This Means for Manufacturers
For manufacturers, the headline is the international reliance route. A framework that recognises approvals from Australia, Canada and the USA would give companies a second path onto the GB market beyond the existing reliance on CE marking, and could materially shorten timelines for products already cleared in those jurisdictions. The compulsory UDI and tighter technical documentation requirements move Great Britain closer to the data and traceability expectations manufacturers already meet under EU MDR and IVDR, which is helpful for anyone running a single quality system across both markets.
The immediate action is the survey. Because the responses will shape the Impact Assessment and the eventual implementation detail, the consultation window is the point at which manufacturers can flag practical concerns about transition timelines, evidence requirements and how the reliance route will work in practice. With the deadline falling on 19 June 2026, anyone with a stake in the GB market has a narrow window to put their position on record.
If you are weighing how the GB pre-market changes sit alongside your EU MDR or IVDR obligations, that is exactly the kind of question worth working through before the consultation closes.